Landing gear ready for production

September 2019

After a long design and production process, we received the first landing gear earlier this year. The landing gear has to be able to absorb a weight of 200 kg and needs enough damping to land AP3 safely. We tested this complex part extensively in our workshop and at Valkenburg Airport. Meanwhile, the test and verification campaign has shown that the landing gear meets all criteria. In the meanwhile the landing gears for our 2 aircraft have been ordered.